finally!

1 comentario »

Wednesday on the morning bus ride, I managed to time things perfectly - I cast off the back of Twist just in time for me to put things away and get off at my stop. unfortunately, the back of the sweater is not the entire sweater, so I didn’t get too far on the NaKniSweMo goal.
DSCF5211

so on Wednesday’s trip home, I didn’t want to start the fronts or sleeves yet, so I pulled out the HP bookscarf and got a few more rows done there.
DSCF5225

now, back to the holiday knitting!
I started a hat:
DSCF5224

and I have the yarn and patterns ready for the rest of the projects:
dscf5226.JPG
dscf5228.JPG
dscf5229.JPG

I just need to get knitting.
5 projects started, 2 finished, 4 more planned.

I’m packed…

1 comentario »

apologies for yet another post without photos. I had intentions of doing a quick photo shoot last night before/while packing, but I got a bit distracted. I really need to get a progress photo of Twist.

a quick WIP Wednesday update:
Twist is going well. I probably won’t finish by the end of the month for NaKniSweMo, but I’ve made some good progress, I think. I’m at the armholes on the back.

at some point during the week, I ran out of yarn and forgot to pack a new ball of yarn. (I thought I had packed it, but apparently I was having a delusional moment). of course, that means I have nothing to knit on an hour-long bus ride home. ugh! so I studied the pattern a bit. and then I had the amazing realization that there was knitting in my bag. The Harry Potter book scarf to the rescue! (maybe it’s not so crazy of me to carry extra knitting around with me.)

Holiday Travel (and Holiday knitting)
we’re heading down to Wisconsin for the weekend. spending Turkey day with one of dh’s friends and whoever else shows up. and then I’m heading north from there to Green Bay to get together with some old camp friends for a quilting/crafting weekend.

so, last night was spent packing. priorities of course, I packed the sewing projects (the 2nd curtain, pajama pants for me, the quilt I mentioned back in May-ish, and the never-ending 5-year+ quilt. aka my first quilt project that I only ever seem to think about working on when meeting up with my camp friends.). while gathering the fabric, I realized I had misplaced the foot I’d bought to applique the May quilt. I found it in with the rest of the feet for the machine. and then I realized that the pattern(s) I had for pajama pants won’t fit me (one would have if I’d bought the Misses sizes instead of the Junior sizes. note to self, pay attention), so I may need to make a side-trip to the store for that (not a problem, at some point we usually end up in a fabric store).

alright, sewing being packed, it’s time to move on to the knitting. I’ve got Twist with me, of course. and 4 extra balls so I can start working on the fronts or the sleeves. whichever I choose to do, I’m doing both at the same time so they match.
since the holiday knitting has been suffering, I’ve made sure to bring plenty of that as well. but what to bring? well, I was going to force myself to work on L’s mittens from last year, but that’s at the house, so I guess those will have to wait a while longer (dammit!). so I’m taking yarn for L’s gift, A’s gift, the poinsettia wreath, and I think something else.

2 balls gone…

2 comentarios »

knitting on the sweater continues. I finished the second ball on the bus this morning. based on the yardage on the pattern, I’m expecting to need 15.

since I’ve got a good portion of the back done (at least 10″ - getting close to the arm shaping), I decided to check how my gauge is doing. seems I’m off. pattern says 19 sts and I’m measuring about 21 sts over the 4″. hmm. I’m making the largest size, which is a few inches over my bust measurement, so I’m thinking (hoping!) I should be ok. at least I’m not on track to have the sweater fit an elephant or something.

I’d like to get back to the holiday knits, but I think half of them got left at the house (we’re going back to get the rest on Friday), so I’m not sure what I have here and what I don’t. we’ll work on unpacking that tonight

startitis is our friend

2 comentarios »

this week, I’ve been taking 4 projects with me for my bus knitting. (I may be insane.)

the HP bookscarf has been living (forgotten) in the tote. no progress on that in ages. Vintage Velvet still lives in the tote as well, though progress on that has stalled, since two new projects have been added this week: the cowl and Twist.

the cowl is finished, except for the seaming up. I really should get that done since it’s been freezing (or really close to it) this week.

I’ve also been actively working on Twist on the bus, though it doesn’t really seem like it. I’ve finally finished the ribbing today and am about to start cabling. woohoo!

other than that, not much else has been going on. I’m thinking NaKniSweMo may have been a not-so-great idea. I fear the holiday knitting is suffering. (then again, it was suffering before too. bugger, I really need to get back to that.)

apologies for lack of photo progress. life is going chaotic right now.

NaKniSweMo

4 comentarios »

after much hemming & hawing, I joined.
I’ve decided to knit Twist. I bought the pattern and swatched ages ago.

I cast on on Saturday, got distracted on Sunday (FO post on that coming soon), and today continued to work my way through the ribbing. I think I got 2 1/2 rows done on the bus this morning. this could take a while…

I’m planning to try cabling without a needle on this project.