well, almost. I ran out of time to weave in the cast on edge before the bus pulled in. but otherwise the Broken Cable Hat (aka Dulaan Hat #3) is done.

the test-knit socks are on hold for a bit. I’m going to work on the CTH glitz socks on the way home tonight.

plans for this weekend: dyeing my skein for the swap. I’m trying to decide if I want to do attempt stripes or a more ‘mottled’ look. and what colors to use and in what order. *sigh* and I thought this would be easy!

in other news, I’ve discovered the joy that is Google Reader. I am attempting to transfer my bloglines subscriptions over (this will be a slow process, I fear). Sorry to those who like to track their subscribers.